Initiatives
Select an initiative to view or update its metadata and full M1 to M96 effect profile.
| Initiative Id | Site | Name | Initiative Type | Label | Status | Actions |
|---|---|---|---|---|---|---|
| 001 | Dolphin | Optimise logistics - flights | Cost Reduction | 2 | Planned | Edit Delete |
| 002 | Dolphin | Optimise logistics - vessels | Cost Reduction | 2 | Planned | Edit Delete |
| 003 | Dolphin | Define minimum safe manning; reduce non-essential offshore roles | Cost Reduction | 2 | Planned | Edit Delete |
| 004 | Dolphin | Reduce non-critical PM and optimise maintenance scope | Cost Reduction | 2 | Planned | Edit Delete |
| 005 | Dolphin | Prioritise inspection on critical equipment from calendar- to condition-based maintenance | Cost Reduction | 2 | Planned | Edit Delete |
| 006 | Dolphin | Extend consumables replacement intervals and reduce inventory levels | Cost Reduction | 2 | Planned | Edit Delete |
| 007 | Dolphin | Reduce unnecessary recycling / compression, optimise operating parameters and alarms / overrides | Cost Reduction | 2 | Planned | Edit Delete |
| 008 | Dolphin | Optimise Process Control Strategy and Loop Performance | Cost Reduction | 2 | Planned | Edit Delete |
| 009 | Dolphin | Remove / isolate redundant equipment and utilities | Cost Reduction | 2 | Planned | Edit Delete |
| 010 | Dolphin | Optimise Operating Strategy for Value, Reliability and Minimum System Configuration | Cost Reduction | 2 | Planned | Edit Delete |
| 011 | Dolphin | Isolate unused wells | Cost Reduction | 2 | Planned | Edit Delete |
| 012 | Dolphin | Chemical optimisation | Cost Reduction | 2 | Planned | Edit Delete |
| 013 | Dolphin | Optimise Environmental Performance (Produced Water and Flare & Venting emissions) | Cost Reduction | 2 | Planned | Edit Delete |
| 014 | Dolphin | Optimise potable and fire water systems | Cost Reduction | 2 | Planned | Edit Delete |
| 015 | Dolphin | NUI Conversion | Cost Reduction | 2 | Planned | Edit Delete |
| 016 | Dolphin | Control system upgrades (DCS /F&G) | Cost Reduction | 2 | Planned | Edit Delete |
| 017 | Dolphin | Redesign Operations, Maintenance and Engineering organisations - onshore and offshore | Cost Reduction | 2 | Planned | Edit Delete |
| 018 | Dolphin | Integrity interval extension | Cost Reduction | 2 | Planned | Edit Delete |
| 019 | Dolphin | Profitable well extension | CAPEX / Production Increase | 2 | Planned | Edit Delete |
| 020 | Dolphin | Manatee Base Case (Sept 2027) | Regulatory / Compliance / SCE / SEAM | 2 | Planned | Edit Delete |
| 022 | Dolphin | Manatee 85% Reliability (Sept 2027) | Regulatory / Compliance / SCE / SEAM | 2 | Planned | Edit Delete |
| 023 | Dolphin | Blackjack Base Case (July 2027) | CAPEX / Production Increase | 2 | Planned | Edit Delete |
| 024 | Dolphin | Blackjack 85% reliability (July 2027) | CAPEX / Production Increase | 2 | Planned | Edit Delete |
| 025 | Dolphin | Blackjack 6M Delay (Jan 2028) | CAPEX / Production Increase | 2 | Planned | Edit Delete |
| 026 | Dolphin | Blackjack 12M Delay (Jun 2028) | CAPEX / Production Increase | 2 | Planned | Edit Delete |