001DolphinOptimise logistics - flightsCost Reduction2PlannedEdit Delete
002DolphinOptimise logistics - vesselsCost Reduction2PlannedEdit Delete
003DolphinDefine minimum safe manning; reduce non-essential offshore rolesCost Reduction2PlannedEdit Delete
004DolphinReduce non-critical PM and optimise maintenance scopeCost Reduction2PlannedEdit Delete
005DolphinPrioritise inspection on critical equipment from calendar- to condition-based maintenanceCost Reduction2PlannedEdit Delete
006DolphinExtend consumables replacement intervals and reduce inventory levelsCost Reduction2PlannedEdit Delete
007DolphinReduce unnecessary recycling / compression, optimise operating parameters and alarms / overridesCost Reduction2PlannedEdit Delete
008DolphinOptimise Process Control Strategy and Loop PerformanceCost Reduction2PlannedEdit Delete
009DolphinRemove / isolate redundant equipment and utilitiesCost Reduction2PlannedEdit Delete
010DolphinOptimise Operating Strategy for Value, Reliability and Minimum System ConfigurationCost Reduction2PlannedEdit Delete
011DolphinIsolate unused wellsCost Reduction2PlannedEdit Delete
012DolphinChemical optimisationCost Reduction2PlannedEdit Delete
013DolphinOptimise Environmental Performance (Produced Water and Flare & Venting emissions)Cost Reduction2PlannedEdit Delete
014DolphinOptimise potable and fire water systemsCost Reduction2PlannedEdit Delete
015DolphinNUI ConversionCost Reduction2PlannedEdit Delete
016DolphinControl system upgrades (DCS /F&G)Cost Reduction2PlannedEdit Delete
017DolphinRedesign Operations, Maintenance and Engineering organisations - onshore and offshoreCost Reduction2PlannedEdit Delete
018DolphinIntegrity interval extensionCost Reduction2PlannedEdit Delete
019DolphinProfitable well extensionCAPEX / Production Increase2PlannedEdit Delete
020DolphinManatee Base Case (Sept 2027)Regulatory / Compliance / SCE / SEAM2PlannedEdit Delete
022DolphinManatee 85% Reliability (Sept 2027)Regulatory / Compliance / SCE / SEAM2PlannedEdit Delete
023DolphinBlackjack Base Case (July 2027)CAPEX / Production Increase2PlannedEdit Delete
024DolphinBlackjack 85% reliability (July 2027)CAPEX / Production Increase2PlannedEdit Delete
025DolphinBlackjack 6M Delay (Jan 2028)CAPEX / Production Increase2PlannedEdit Delete
026DolphinBlackjack 12M Delay (Jun 2028)CAPEX / Production Increase2PlannedEdit Delete