Scenario
scenario 1
ECMA · pricing data OP25 · anchor Jul 2026
Edit scenario
Select initiatives
Choose one or more initiatives for this run.
25 available
Initiatives to include
001 - Optimise logistics - flights
002 - Optimise logistics - vessels
003 - Define minimum safe manning; reduce non-essential offshore roles
004 - Reduce non-critical PM and optimise maintenance scope
005 - Prioritise inspection on critical equipment from calendar- to condition-based maintenance
006 - Extend consumables replacement intervals and reduce inventory levels
007 - Reduce unnecessary recycling / compression, optimise operating parameters and alarms / overrides
008 - Optimise Process Control Strategy and Loop Performance
009 - Remove / isolate redundant equipment and utilities
010 - Optimise Operating Strategy for Value, Reliability and Minimum System Configuration
011 - Isolate unused wells
012 - Chemical optimisation
013 - Optimise Environmental Performance (Produced Water and Flare & Venting emissions)
014 - Optimise potable and fire water systems
015 - NUI Conversion
016 - Control system upgrades (DCS /F&G)
017 - Redesign Operations, Maintenance and Engineering organisations - onshore and offshore
018 - Integrity interval extension
019 - Profitable well extension
020 - Manatee Base Case (Sept 2027)
022 - Manatee 85% Reliability (Sept 2027)
023 - Blackjack Base Case (July 2027)
024 - Blackjack 85% reliability (July 2027)
025 - Blackjack 6M Delay (Jan 2028)
026 - Blackjack 12M Delay (Jun 2028)
Use Ctrl or Command to select multiple initiatives.
Run optimization
Optimization history
Run 12
COMPLETED
Run 11
COMPLETED
Run 10
COMPLETED
Run 9
COMPLETED
Run 8
COMPLETED
Run 7
COMPLETED
Run 6
FAILED
Run 5
FAILED
Run 4
FAILED
Run 3
FAILED
Run 2
FAILED
Run 1
FAILED